Capacity & Tariff
| S.NO | Name of Pipeline | Capacity In (MMSCMD) | Tariff In Rs/MMBTU # | |||||
| Authorized Capacity* | Total Common Carrier Capacity* | Available Common Carrier Capacity* | Zone 1 | Zone 2 | Zone 3 | |||
| 1 | Dadri Panipat RLNG Pipeline | 9.5 | 2.375 | 2.273 |
This pipeline is part of NGGS Network and Unified Tariff is applicable on these pipelines presently.
Existing Unified Tariff^^: ZONE 1- 54.00, ZONE 2- 102.86 |
|||
| 2 | Ennore-Tuticorin-Bengaluru Pipeline | 34.67 | 8.667 | 8.667 | 6.4 | 6.53 | 7.19 | |
| Note. | |
| 1 |
^^tariff zones for unified tariff” means the- i. first tariff zone for unified tariff of a length of three hundred kilometres from the unified entry point on either side of the national gas grid system; ii. (second tariff zone for unified tariff of a length beyond three hundred kilometers on either side of the first tariff zone of national gas grid system, |
| 2 | * As per Schedule –I ,under Regulation 4 (2) of the Petroleum and Natural Gas Regulatory Board (Access Code for Common Carrier or Contract Carrier Natural Gas Pipelines ) Regulations, 2008 , it shall be subject to declaration from time to time to PNGRB. |
| 3 | # As per PNGRB's Tariff Orders and it shall be subject to determination/ fixation by PNGRB, from time to time, under the PNGRB (Determination of Natural Gas Pipeline Tariff) Regulations, 2008 |
| 4 | #For Zone-wise Pipeline updated Tariff may confirm during Capacity Booking. |